A large gearbox needed to be transported from Rotterdam towards Tuzla shipyard Istanbul Turkey.
SCS has road permits upto 4 meter wide between Holland and Turkey.
This way we could react quickly and delivered this equipment within 8 days.
After unloading we took the damaged gearbox back for repair to Holland.